BuildPro
Project: Skyline Tower
Clear conditions
Detroit, Michigan • Good for pouring
72°
Material Delay: Steel Beams
Delivery from Midwest Steel delayed by 48hrs. Schedule adjusted automatically.
124
Active Crew On-site
96%
Safety Compliance

Phase 2 Progress

View Timeline
Structural Framing 68%

Master Schedule

Updated Today
All Tasks
In Progress
Delayed
Completed

Foundation Pour (Zone A)

Aug 01 – Aug 05 • Lead: Foreman Jenkins

Done
Concrete Volume:450 cu yds
Curing Test:Passed (4200 PSI)

Steel Erection (Levels 1-3)

Aug 06 – Aug 20 • Lead: Ironworkers Local

Active
Equipment:Tower Crane #1
Dependencies:Foundation (Cleared)

HVAC Rough-in

Aug 22 – Sep 05 • Lead: Mech. Systems LLC

Delayed
Reason:Ducting material shortage

Assign Work Order

Active Field Tasks

MR
Mike Ramirez
Electrical Foreman • Level 2
In Prog
Run main conduit lines from Server Room A to Distribution Panel.

Site Radar

GPS Active

Managed Locations

Detroit Core Hub (Current)

Downtown Detroit • Active Crew: 124

Midtown Development

Woodward Ave • Site Prep Phase • Crew: 15

L3 Structural Layout

Approved V2.4
Structural
Electrical
Plumbing
HVAC
Blueprint

Revision History

Version 2.4 (Current) Aug 02, 2026
Updated load bearing calculations for East Wing. Uploaded by Architect S. Davis.
Version 2.3 Jul 15, 2026
Initial electrical overlay integration.