BuildPro
Skyline Tower A
Active Crew
42 / 50
On-Time Rate
94%
Safety Incidents
0
Budget Spent
$1.2M
Overall Completion
Phase 2: Structural Framing
68%
Quick Site Summary
Concrete Pouring – Level 4
Inspection passed at 09:30 AM by Chief Inspector Miller.
HVAC Ducting Install
In progress by Mechanical Team B. On schedule.
Project Schedule Timeline
Q3 2026
May 01 – Jun 15, 2026
Jun 16 – Jul 20, 2026
Jul 21 – Sep 10, 2026
Sep 11 – Oct 30, 2026
Assign Crew Work Task
Active Field Assignments
JD
John Doe
Steel Framing Lead • Zone B
Install Beam Connectors on Column 14-B
MS
Mike Smith
Electrical Master • Level 2
Conduit Pulling & Main Panel Prep
Job Sites Map Radar
Active Site Locations
Skyline Tower A (Main Site)
350 5th Ave, New York, NY • Active Crew: 32
Oakridge Industrial Park
Queens, NY • Excavation Phase • Active Crew: 10
Level 3 Structural Blueprint
1
2
Blueprint Notes & Inspections
Pin #1 (North Wing)
Passed load bearing slab test 4,000 PSI.
Pin #2 (East Elevator Shaft)
Rebar layout verified against CAD model v2.1.