Active Project
Skyline Tower A
72%
Project Health
On schedule. Structural framing completing this week.
New Task
Daily Log
Photos
Report
Today’s Briefing
78°
Clear conditions • Wind 5mph
Recent Activity
Inspection Passed
Level 2 Electrical Rough-in approved by City Inspector.
Blueprint Updated
Architect uploaded v2.4 Structural modifications.
Task Manager
+ New Task
All Active
My Crew
Delayed
Install Safety Railings
Deliver materials via crane
Bolt down perimeter anchors
Electrical Main Conduit Run
Clear pathway obstructions
Install hangers every 5ft
Site Radar
Managed Locations
Skyline Tower A
Downtown Detroit • 124 Personnel
Midtown Dev Park
Woodward Ave • 15 Personnel
Document Viewer
v2.4 ▾
Structural
Electrical
HVAC