Project: Skyline Tower
Clear conditions
Detroit, Michigan • Good for pouring
72°
Material Delay: Steel Beams
Delivery from Midwest Steel delayed by 48hrs. Schedule adjusted automatically.
124
Active Crew On-site
96%
Safety Compliance
Phase 2 Progress
View Timeline
Structural Framing
68%
Master Schedule
Updated Today
Foundation Pour (Zone A)
Aug 01 – Aug 05 • Lead: Foreman Jenkins
Done
Concrete Volume:450 cu yds
Curing Test:Passed (4200 PSI)
Steel Erection (Levels 1-3)
Aug 06 – Aug 20 • Lead: Ironworkers Local
Active
Equipment:Tower Crane #1
Dependencies:Foundation (Cleared)
HVAC Rough-in
Aug 22 – Sep 05 • Lead: Mech. Systems LLC
Delayed
Reason:Ducting material shortage
Assign Work Order
Active Field Tasks
MR
Mike Ramirez
Electrical Foreman • Level 2
Run main conduit lines from Server Room A to Distribution Panel.
Site Radar
GPS ActiveManaged Locations
Detroit Core Hub (Current)
Downtown Detroit • Active Crew: 124
Midtown Development
Woodward Ave • Site Prep Phase • Crew: 15
L3 Structural Layout
Approved V2.4
Revision History
Version 2.4 (Current)
Aug 02, 2026
Updated load bearing calculations for East Wing. Uploaded by Architect S. Davis.
Version 2.3
Jul 15, 2026
Initial electrical overlay integration.